How to compare renovation quotes in Singapore
Compare the same scope, on the same tax basis. Give each firm the same brief. Ask for an itemised quote with quantities, specifications, exclusions and GST treatment. Add the items you still need to buy or arrange separately, and distinguish fixed prices from allowances. Only then compare the total and decide who is responsible for each part of the job.
Start with the renovation cost guide if you need a budget range. This guide is for the next decision: choosing between actual proposals. It works for HDB, condo and landed interiors, though building rules, approvals and specialist work depend on the property and scope.
- Write one brief and ask each firm to quote against it.
- Match items by quantity, finish and included labour.
- Separate fixed work, allowances, exclusions and owner purchases.
- Bring each offer to the same tax basis and calculate the comparable total.
- Put changes, payment milestones, handover and warranty terms in writing.
Give every firm the same renovation brief

Mark your floor plan room by room: what stays, what goes, what gets added and what is still undecided. Add the access conditions, the appliance list and any drawings you already have. Include a short priority list so the firms can show where they would save without taking essential work out of the quote.
Swipe to see the full table →
| If the quote says… | Ask for… | Why it changes the price |
|---|---|---|
| Kitchen carpentry | Base and overhead lengths and heights, board and finish, cabinet internals, hardware and installation. | A short cabinet run and a full-height pantry are different quantities. |
| Electrical works | A point schedule, what each point includes, and whether upgrades or relocation are included. | An allowance for ten points is not a price for every point on your plan. |
| Bathroom package | Demolition or overlay scope, waterproofing, testing, fixture supply and installation. | Some packages include labour and leave fixture purchase to you. |
| Floor finishes | Area, supply rate, preparation, installation, transitions and skirting. | Tile supply per square foot is only part of the installed cost. |
| Site preparation | Protection, haulage, debris disposal, access charges and making good. | These can be excluded even when the core work is priced. |
When a measurement is provisional, ask what happens after the site visit. For a quoted unit rate, check the unit, what is included in it and how the quantity will be measured. A kitchen cabinet figure is only comparable if both firms are measuring the same elements.
Worked example: the lower quote can cost more

Assume both firms have confirmed the same final specification and all figures below include any applicable GST. The numbers are illustrative and show the comparison method; they are not prices for a particular property.
Swipe to see the full table →
| Comparable scope | Quote A | Quote B |
|---|---|---|
| Quoted total | S$42,000 | S$47,000 |
| Electrical items required for the brief | +S$2,400 | Included |
| Countertop supply and installation | +S$2,800 | Included |
| Protection and disposal | +S$1,000 | Included |
| Comparable total | S$48,200 | S$47,000 |
Quote A looked S$5,000 cheaper. Once both figures cover the same work, it is S$1,200 higher. If one of the add-ons is still an estimate, mark the revised total as provisional. Do not count an item twice just because one firm shows it as a separate line and another bundles it.
Use these columns in your own comparison
Room or trade · required work · quantity · specification · quoted price · included/excluded/allowance · amount to add · who supplies and installs it. Keep common owner purchases and your contingency in a separate project budget. If each quote includes a different level of design or project management, note what it buys you before comparing the totals.
The Excel workbook includes worked HDB and resale condo quotes, a blank comparison sheet and a separate project budget for owner purchases, contingency and refundable deposits. The sample prices are illustrative.
Find the exclusions that become late bills
An exclusion is outside the price. An allowance is a budget placeholder for an item not fully specified or measured. A variation is a change to the agreed contract scope. Ask the firm to identify all three and explain how it calculates adjustments. Before approving a variation, get the revised scope, price and effect on handover in writing.
- Owner purchases: check appliances, taps, sanitary fittings, lighting and loose furniture. If you supply something, confirm who receives, installs and tests it.
- Existing conditions: ask what happens if stripping out reveals substrate damage, old wiring, leaks or other work outside the quote. Who assesses it and approves the remedy?
- Building access: for condos, ask the management office about renovation requirements and distinguish a refundable deposit from a non-refundable fee. Confirm protection, disposal and access responsibilities.
- Tax and fees: check whether applicable GST and mandatory charges are in the total. Ask the firm for a revised written total on a like-for-like basis.
The Competition and Consumer Commission of Singapore’s renovation industry guidance calls for transparent pricing, itemised charges and clear descriptions of the work. Read the fair trading guide.
What to check before signing a renovation contract
Know who is accountable. A design firm can handle drawings, selections and coordination; a contractor may focus on execution or offer design as part of its service. Confirm what each firm is actually delivering and who is your contact on site. If you choose to coordinate individual trades yourself, decide who is responsible for the sequencing and any gaps between their scopes.
For HDB work, check the contractor against HDB’s directory and clarify who handles required permits. If you are waiting for BTO keys, see the BTO timeline and key-collection checklist before booking site work. If the firm promotes CaseTrust accreditation or deposit protection, verify the current accreditation and request the documents applicable to your contract.
- Contract and attachments: confirm the legal entity and that the final quote, drawings and finish schedule are included.
- Payment milestones: connect instalments to clear deliverables. Ask what counts as complete and how changes are documented.
- Programme: request expected dates, dependencies and who supplies critical items.
- Handover and aftercare: agree how defects are recorded, who rectifies them, and the scope and terms of any warranty.
Renovation quotation FAQs
How many renovation quotes should I get?
Three comparable quotes are a useful starting point. The number matters less than sending the same written brief and asking each firm to price the same work.
Is an interior designer always more expensive than a contractor?
No. Services, quantities, specifications and exclusions vary. Identify the design and coordination included, then compare like-for-like construction work and the service you need.
What should a renovation quotation include?
Ask for the work by room or trade, quantities, materials, labour, exclusions, allowances and applicable GST. Use the scope checklist to spot vague line items.
How do I tell whether a renovation package is cheaper?
Add required work and purchases excluded from each package, and compare on the same tax basis. See the worked comparison for a simple example.
What if a contractor asks for more money after work starts?
Ask for the reason and the relevant contract item. For a change, get the proposed work, cost and time impact in writing before agreeing. Keep approved variations with the contract and invoices.
Sources and further reading
- CCCS: Guide on fair trading practices for the renovation industry